Risk is calculated for two different set of ignition points within a project area. These are:
-
Asset Risk - ignition points associated with electric utility infrastructure overhead assets
-
Territory Wide Risk - a regular grid of ignition points across a service territory.
Independent of the ignition source, a consistent set of risk metrics are calculated and assigned back to the ignition locations.
the following table provides a summary of the risk outputs that are derived for the daily risk forecasts and available in the FireRisk application.
|
Risk Forecast Output Data |
|
|
Dataset |
Description |
|
Risk Associated with Ignition Locations (either Asset or Territory Wide ignition locations) |
|